The project is being constructed by Great Lakes Dredge & Dock and Nass Contracting.The overall works in this project consists of forming the landmass Phase 2 of Investment Gateway Bahrain for Amar Real Estate. The landmass is protected with rockworks of varying size and thickness dependent on the degree of exposure of the fill. The reclamation material is to be taken from a number of approved borrow areas defined in the
vicinity of the site.The work is planned to be executed in 15months, consists of approx. 2.75 million m2 of Reclamation area with Edge Protection works of 5.40Km.