King Faisal Corniche Development Bahrain: The Avenues Mall

Project Highlights

CLIENT: King Faisal Corniche
CONSULTANT: MSCEB
LOCATION: Corniche between Bahrain Financial Harbour and Bahrain Bay

Project Description

Development of the existing Corniche with land area of 272,344m² into high end retail facility consisting of build-up area of 83,800 m² which includes a mall building of 81,900m² (inclusive of 16,850m² basement and 400m² mezzanine) and external buildings of 1,900m², and external works development of 222,000m² consisting of a parking lot for about 1,000 cars, driveways, landscaped Corniche, boardwalk, walkways, etc. The Stage 1 Works Package covers the piling, basement and main mall building up to ground floor level.

Scope of Works:

  • Mobilization.
  • Excavation, dewatering and lateral support where required.
  • Piling, pile caps, basement raft slab, retaining walls and ground floor grade slab.
  • Temporary hoarding along EWA corridor.