Link road in-between Gulf of Bahrain Road with Al Sahel Development. Approximately 10.0 km new road will be constructed as a dual two-lane carriageway with associated stormwater drainage and other utility works (Package-A: 4,700m)
The Scope of works consisting of the following:
4700m Road Works (2 Lanes Dual Carriageway)
Road Marking and Signage Work
Drainage Works (Storm Water Line 3,760m)
TSE Line (5,000m)
Street Lighting and Miscellaneous Works
8m Deep Pumping Station including MEP
3 Nos. Culvert and 1 No. Outfall