SOUTH BAHRAIN LOOP ROADS (SBLR) STAGE 2 (PACKAGE A)

Project Highlights

CLIENT: Ministry of Works
CONSULATANT: MOW
LOCATION: Al Jazair

Project Description

Link road in-between Gulf of Bahrain Road with Al Sahel Development. Approximately 10.0 km new road will be constructed as a dual two-lane carriageway with associated stormwater drainage and other utility works (Package-A: 4,700m)

The Scope of works consisting of the following:

 4700m Road Works (2 Lanes Dual Carriageway)
 Road Marking and Signage Work
 Drainage Works (Storm Water Line 3,760m)
 TSE Line (5,000m)
 Street Lighting and Miscellaneous Works
 8m Deep Pumping Station including MEP
 3 Nos. Culvert and 1 No. Outfall
 Safety Barriers (Concrete and TCB)